02.23.2012 _ SKETCHING ON-SITE








The aim of all construction on this site is minimal impact to the existing ecosystem. This creates a unique challenge to the design and construction process, considering the complex slope and density of trees. Therefore, we decided to begin the project on-site, identifying possible building sites, routes for transportation of materials, paths for humans, and solidifying the overall project concept. Eventually, we developed the first phase of the project by “sketching” with orange lines on site.